{[['']]}
In April 1979, Enterprise was mated to a pair of inert Solid Rocket Boosters and the External Tank scheduled for the STS-1 mission. The stack was transported atop the MLP-1 to Pad 39A on May 1st, 1979. At the pad, Enterprise helped verify that maintenance platforms were in the correct locations.
Click below to download the Stack for this model. Use the Early MLP-1 files for this model.
ET 1979 configuration (2.4 mb)
SRB's 1979 stack configuration (1.3 mb)
Niciun comentariu:
Trimiteți un comentariu